NAVI MUMBAI: Because the work on 11km Navi Mumbai Metro (NMM) Line-1 between Belapur and Pendhar-Taloja is on the verge of completion and awaiting business operations, the Metropolis and Industrial Improvement Company (Cidco) is charting out an in depth mission report (DPR) to attach the upcoming Navi Mumbai Worldwide Airport (NMIA) with Chhatrapati Shivaji Maharaj Worldwide Airport (CSMIA) through Mankhurd, crossing Thane Creek.
Navi Mumbai Metro Line-1 might be prolonged to attach with Mumbai Metro Line 8 at Mankhurd. The Metro 8 hall will function the primary mass speedy transport system between Mumbai airport and Navi Mumbai airport. “MMRDA has already earmarked a metro hyperlink between the 2 airports by means of metro line-8 and has accomplished the DPR for the CSMIA-Mankhurd portion of 11.1 km stretch,” stated Cidco managing director Sanjay Mukherjee, including that Cidco has commenced detailed mission report (DPR) for remaining portion of Line-8 (Mankhurd to NMIA) and increasing Navi Mumbai Metro Line 1 from Belapur to NMIA.
Navi Mumbai Metro Line-1 might be prolonged to attach with Mumbai Metro Line 8 at Mankhurd. The Metro 8 hall will function the primary mass speedy transport system between Mumbai airport and Navi Mumbai airport. “MMRDA has already earmarked a metro hyperlink between the 2 airports by means of metro line-8 and has accomplished the DPR for the CSMIA-Mankhurd portion of 11.1 km stretch,” stated Cidco managing director Sanjay Mukherjee, including that Cidco has commenced detailed mission report (DPR) for remaining portion of Line-8 (Mankhurd to NMIA) and increasing Navi Mumbai Metro Line 1 from Belapur to NMIA.